ATHA Energy Successfully Completes Diamond Drilling at RIB North Discovery, Expanding Strike Length To 3.4 Km, And Identifies a Higher-Grade Sub Zone: Results Include Ribn-Dd-023 Intersecting 19.5 M Of Composite Uranium Mineralization With 2.0 M Of High-Grade Metals October 7, 2026 HIGHLIGHTS Preliminary results from the final seven diamond drillholes (See July 9th and September 8th, 2026 news releases for other…
ATHA Energy Reports Widest Intersection to Date at Rib North Discovery with 37 m of Composite Uranium Mineralization in Ribn-DD-003 – Multiple Drillholes Demonstrating Continuity of Uranium Mineralization Metals July 9, 2026 HIGHLIGHTS First eight diamond drillholes completed at the RIB North Discovery (Figure 1) – as part of the recently commenced…
Atha Energy Makes Major New High-Grade Discovery along the Lac 50 Corridor – Intersects 11.5 m of Composite Uranium Mineralization Including 1.6 m of Near Continuous High-Grade 4 km Along Strike from Lac 50 Deposit Area Metals July 8, 2026 HIGHLIGHTS First regional test along the Lac 50 Deposit Corridor, as part of the recently commenced 2026 Angilak Exploration Program,…